Completed Projects

  1. Project Leader for Research University Grant (RUG) Program: Tier 2E entitled SOLVING TIME DEPENDENT VEHICLE ROUTING PROBLEM WITH DUE DATES USING METAHEURISTIC ALGORITHMS (1/4/2014-30/6/2015), RM28 040, Vote Number: Q.J1300000.2626.09J67
  2. Researcher for Research University Grant (RUG) Program: Tier 1 entitled MODELING AND NUMERICAL SIMULATION OF THERMAL CONTROL CURING PROCESS FOR THERMOSET (1/7/2014-30/9/2015), RM 20 000, Vote Number: Q.J1300000.2526.08H58
  3. Researcher for Research University Grant (RUG) Program: Tier 1 entitled MODELING ON ASCENDING, DESCENDING AND ABITRARY ORDER CHARACTERISTIC OF TASK (1/7/2014-30/6/2015), RM 20 000, Vote Number: Q.J1300000.2526.08H49
  4. Researcher for Research University Grant (RUG) Program: Tier 2E entitled OPTIMAL CONTROL OF VECTOR-BORNE DISEASE IN METAPOPULATION (1/4/2014-30/6/2015), RM 28 040, Vote Number: Q.J1300000.2626.09J69
  5. Researcher for Research University Grant (RUG) Program: Tier 2 entitled ONLINE SCHEDULING IN PARALLEL PROCESSOR SYSTEM (1/12/2012-31/12/2013), RM 32 000, Vote Number: Q.J1300000.2626.08J11
  6. Researcher for Research University Grant (RUG) Program: Tier 2 entitled A MECHANISTIC MODEL OF HIGH DOSE IRRADIATION DAMAGE (1/12/2012-31/12/2013), RM 32 000, Vote Number: Q.J1300000.2626.07J60
  7. Researcher for Research University Grant (RUG) Program: Tier 1 entitled NUMERICAL COMPUTATION AND SIMULATION OF PHYSIOLOGICAL FLUID FLOW (1/7/2014-30/6/2015), RM 20 000, Vote Number: Q.J1300000.2526.08H53
  8. Researcher for Fundamental Research Project entitled THE APPLICATIONS OF METAHEURISTICS IN INVENTORY ROUTING PROBLEMS (1/9/2014-31/8/2015), RM20 000, Vote Number: J130000.2726.01K28
  9. A member of Group of Industrial and Scientific Computing, 2004
  10. Researcher for Fundamental Research Project entitled A Study of General Method in Job Scheduling Problem (30/6/2000-30/12/2001), RM32 000, Vote Number: 75119